* CONSTRUCTION MANAGEMENT AND SERVICES - SELECT PROJECTS*
Kraft Engineering
and Surveying, Inc.
 CIVIL ENGINEERS        SURVEYORS        LAND PLANNERS
Fenton Road Watermain Extension, Maple Avenue to Bristol Road

Surveys, design engineering, and construction engineering for construction
of 5,000 feet of new 16” water main to provide public water supply and to
connect with existing 30” water main at Maple Avenue and to existing 12”
dead-end water main on Fenton Road just south of Bristol Road; construct
gate valves and hydrants; and place 8” water main stubs at existing side
streets for future extensions.

Construction Cost $900,000

Ballenger Highway, Flint City Limits to Swartz Creek Bridge

Surveys, design engineering, and construction engineering for
rehabilitation of 1.02 miles of two-lane paved road including curb and
gutter, storm sewer, utility adjustments, and guardrail.

Construction Cost $1.2 Million

Western Hills & Townhouses of Western Hills Subdivision

Design engineering and construction engineering for reconstruction and
rehabilitation of 5.5 miles of paved residential roadway, including curb and
gutter, storm sewer, and utility adjustments.

Construction Cost $2.8 million

Davison Sanitary Sewer

5,300 feet of 12” Sanitary Sewer and pump station from East Genesee
County Line to the City of Davison.

Construction Cost $450,000

Mallard Ponds Development

New 174 Unit Residential Development in the City of Burton including water
main, sanitary sewer, storm sewer, asphalt roads with concrete curb and
gutter.

Construction Cost $1.2 million

Linden Road Reconstruction

Reconstruction of 1.2 miles of existing 5 lane concrete road to 5 lane
asphalt road with concrete curb and gutter between Bristol Road and
Lennon Road; project included relocation of existing water main and
sanitary sewer.

Construction Cost $2.1 million

Irish Road Bridge Over the Kearsley Creek

Remove existing 2 lane bridge and construct new 50’ long 5 lane bridge
with sidewalk; bridge construction included reinforced concrete deck on pre-
stressed, post-tensioned concrete box beams, and 1410’ of approach
roadway; relocation of existing 20” D.I.P. water main and 27” RCP sanitary
sewer.

Construction Cost $1.1 million

Flint Township Recreational Parks and Trail

Construction included 1 mile of non-motorized pathways around the new
Flint Township Police Station; the pathways included asphalt and wood chip
trails, rest stations, a culvert bridge over the White Drain and a 1,500
square foot pavilion.

Construction Cost $250,000
Mallard Ponds
Irish Road Bridge
Flint Township Non-Motorized Path
Irish Road Bridge
Western Hills
Click on
photos to
enlarge.  
They will
open in a
new
window.  
Close  
window  
when
finished
viewing.
Fenton Road Watermain
Fenton Road Watermain