Gale Road and Davison Road Watermain Extensions
3,770’ of 12” D.I.P. including a 60’ bore under CN/GTW Railroad and a
104’ bore under Davison Road.
Vassar Road Branch of the Gilkey Creek
Genesee County Drain Commissioner drain extension to service a 66
acre drainage area. Construction included 1,100’ of Open Ditch and
2,460’ of Enclosed Storm Sewer and Culverts.
McLaren Educational Building
Utilities to supply building required 810’ of 8” D.I.P. for public watermain;
1,120’ of 2-1/2" SDR-21 PVC for private sanitary forcemain and private
sanitary pump station.
Davison Township Sanitary Sewer and Watermain Master Plan
Complete mapping of the township’s sanitary sewer and watermain
existing and proposed infrastructure.
Davison Township Sanitary Sewer Capacity Study
Detailed capacity analysis of the townships existing sanitary sewers based
on the current population and zoning.